Sustainability rooted in efficiency
We’ve always been driven by efficiency and value, striving to use less material and energy whilst achieving superior aesthetics and outcomes. It's an approach that adds not just value, but enshrines sustainability, because it lowers the overall carbon cost of assets.
Integrated Management System
We are certified to both ISO9001 (Quality Management) & ISO14001 (Environmental Management). The Leadership Team at Bryden Wood are committed to the continual improvement of quality and environmental issues that impact our business, projects, clients and employees.
Please download our Integrated Management System (IMS) policy below for further information.
Bryden Wood’s scope is available upon request, please contact Nadine Mohammed.
Enlarge
Story
Enlarge
Story
Enlarge
Story
Proof Points
Achievement
Project / Comments
Upgraded classroom designs resulted in the offset of 50 years of carbon emissions in use (vs. current)
HCC PCP Embodied Energy Evaluation
Estimated 30% reduction in embodied energy against benchmark
Sainsbury's Low Cost store
Exceeded client targets of 60% reduced carbon emissions and 20% renewable energy sources. The application of a combination of a wood pellet biomass boiler, gas fired CHP, and photovoltaic panels resulted in 31% renewable sources and a 24% improvement over the standards of AD Part L2.
Deptford Green School (Winner of Best Educational Building in the UK 2013 in the LABC Architectural Awards in November 2013 Achieved BREEAM ‘Excellent’)
Achievement
Project / Comments
No working at height in construction process
Factory in a box, GSK
BWL optimised the structural solution enabling the inclusion of an increased height mezzanine plant deck as well as reducing the number of ramps within the design (all within the tight height constraints defined by the airport.)
Gatwick airport
Described by one visitor as "An oasis of light and space," we are rightly proud of the fabulous environment our students have to work in. Plus the classrooms are 25% larger than statutory regulations.
Deptford Green School (Winner of Best Educational Building in the UK 2013 in the LABC Architectural Awards in November 2013 Achieved BREEAM ‘Excellent’)
Achievement
Project / Comments
We used a semi-automated drawing production method, to reduce the number of staff members required by 17 and saved 20 months on the design programme.
Heathrow T5
We saved £1.8m on plane 'stand time'
Heathrow T5 Nodes
The CLopen gate rooms (closed-open) allow for a flexible response to occupancy levels within the pier, offering additional seating to passengers at peak times.
Gatwick airport
5000m2 of floor area built in 8 months with 1/3 of labour on site
Heathrow Temp FCC
Achievement
Project / Comments
Prefabricated timber cassettes used as the structural solution to produce a lightweight low carbon solution.
MET police, Wandsworth Station
Achieved 58% reduction in total weight per cladding bay vs traditional benchmark
Crossrail
All timber from 100% FSC/PEFC certified managed forests
Ecocanopy
Compared to traditional store- 40% reduction in steel, 58% reduction in fa
Sainsbury's Low Cost store
Achievement
Project / Comments
The client is benefiting from the increased knowledge base of their design team as a result of the IESE framework. This brings initiative, savings and increased quality to the project.
MET police, Wandsworth Station
82% labour site productivity
Factory in a box, GSK
Achievement
Project / Comments
Factory controlled manufacture coupled with an assembly approach on site has reduced pollution through construction to almost nil
Ecocanopy
A reduction in carbon emission of 60%
Deptford Green School (Winner of Best Educational Building in the UK 2013 in the LABC Architectural Awards in November 2013 Achieved BREEAM
Achievement
Project / Comments
Estimated 40% reduction in construction related vehicle movements vs precast alternative
Gutenborg residential scheme, Russia
The new operationally excellent facility focuses on passenger journey. The circulation was optimised by BWL to minimise the number of level changes resulting in a more accessible building
Gatwick airport
Only 5 site operatives required to install 1km of modules
BAA Coridor segregation
Achievement
Project / Comments
Crush from demolition used to address soil stabilization and minimize waste going to landfill.
MET police, Wandsworth Station
97% of materials used in final product, 3% waste; 90% of waste is recycled or reused
Ecocanopy
Estimated 35% reduction in construction waste against benchmark
Sainsbury's Low Cost store
Energy
Health & Wellbeing
Innovation
Materials
Management
Pollution
Transport
Waste