Sustainability

Lean, efficient design is the best form of sustainable design

Sustainability rooted in efficiency

We’ve always been driven by efficiency and value, striving to use less material and energy whilst achieving superior aesthetics and outcomes. It's an approach that adds not just value, but enshrines sustainability, because it lowers the overall carbon cost of assets.

 

Integrated Management System

We are certified to both ISO9001 (Quality Management) & ISO14001 (Environmental Management). The Leadership Team at Bryden Wood are committed to the continual improvement of quality and environmental issues that impact our business, projects, clients and employees.

Please download our Integrated Management System (IMS) policy below for further information.

Bryden Wood’s scope is available upon request, please contact Nadine Mohammed.

Enlarge

Story

Enlarge

Story

Enlarge

Story

Proof Points

Achievement

Project / Comments

Upgraded classroom designs resulted in the offset of 50 years of carbon emissions in use (vs. current)

HCC PCP Embodied Energy Evaluation

Estimated 30% reduction in embodied energy against benchmark

Sainsbury's Low Cost store

Exceeded client targets of 60% reduced carbon emissions and 20% renewable energy sources. The application of a combination of a wood pellet biomass boiler, gas fired CHP, and photovoltaic panels resulted in 31% renewable sources and a 24% improvement over the standards of AD Part L2.

Deptford Green School (Winner of Best Educational Building in the UK 2013 in the LABC Architectural Awards in November 2013 Achieved BREEAM ‘Excellent’)

Achievement

Project / Comments

No working at height in construction process

Factory in a box, GSK

BWL optimised the structural solution enabling the inclusion of an increased height mezzanine plant deck as well as reducing the number of ramps within the design (all within the tight height constraints defined by the airport.)

Gatwick airport

Described by one visitor as "An oasis of light and space," we are rightly proud of the fabulous environment our students have to work in. Plus the classrooms are 25% larger than statutory regulations.

Deptford Green School (Winner of Best Educational Building in the UK 2013 in the LABC Architectural Awards in November 2013 Achieved BREEAM ‘Excellent’)

Achievement

Project / Comments

We used a semi-automated drawing production method, to reduce the number of staff members required by 17 and saved 20 months on the design programme.

Heathrow T5

We saved £1.8m on plane 'stand time'

Heathrow T5 Nodes

The CLopen gate rooms (closed-open) allow for a flexible response to occupancy levels within the pier, offering additional seating to passengers at peak times.

Gatwick airport

5000m2 of floor area built in 8 months with 1/3 of labour on site

Heathrow Temp FCC

Achievement

Project / Comments

Prefabricated timber cassettes used as the structural solution to produce a lightweight low carbon solution.

MET police, Wandsworth Station

Achieved 58% reduction in total weight per cladding bay vs traditional benchmark

Crossrail

All timber from 100% FSC/PEFC certified managed forests

Ecocanopy

Compared to traditional store- 40% reduction in steel, 58% reduction in fa

Sainsbury's Low Cost store

Achievement

Project / Comments

The client is benefiting from the increased knowledge base of their design team as a result of the IESE framework. This brings initiative, savings and increased quality to the project.

MET police, Wandsworth Station

82% labour site productivity

Factory in a box, GSK

Achievement

Project / Comments

Factory controlled manufacture coupled with an assembly approach on site has reduced pollution through construction to almost nil

Ecocanopy

A reduction in carbon emission of 60%

Deptford Green School (Winner of Best Educational Building in the UK 2013 in the LABC Architectural Awards in November 2013 Achieved BREEAM

Achievement

Project / Comments

Estimated 40% reduction in construction related vehicle movements vs precast alternative

Gutenborg residential scheme, Russia

The new operationally excellent facility focuses on passenger journey. The circulation was optimised by BWL to minimise the number of level changes resulting in a more accessible building

Gatwick airport

Only 5 site operatives required to install 1km of modules

BAA Coridor segregation

Achievement

Project / Comments

Crush from demolition used to address soil stabilization and minimize waste going to landfill.

MET police, Wandsworth Station

97% of materials used in final product, 3% waste; 90% of waste is recycled or reused

Ecocanopy

Estimated 35% reduction in construction waste against benchmark

Sainsbury's Low Cost store

  • Energy

  • Health & Wellbeing

  • Innovation

  • Materials

  • Management

  • Pollution

  • Transport

  • Waste


Resources


100 Gray's Inn Road, London, WC1X 8AL


Send an Enquiry

To find out about how we process your data, please read our privacy policy.

Send

Upload CV / Cover Letter / Portfolio

UploadCV / Cover Letter / Portfolio

+ Add

To find out about how we process your data, please read our privacy policy.

Send

News & Updates

Please sign up to receive news and updates from Bryden Wood

To find out about how we process your data, please read our privacy policy.

Send